Haven't done the best updating this, here was today's work
- Replaced F-745L fuselage rib
- fabricated doubler to hold GAD 29
- primed (stewart systems ecoprime) upper forward fuselage parts F-745L fuselage rib, F-768-L outboard sub panel, WD-745-L (replaced with new) and WD-745-R canopy rails, F-631-A (-R and -L) canopy rear supports, and ELT bracket
- came out rough textured, first time using HVLP spray gun. Finished product is OK and looks good. Primer seems to be tougher than spray paint primer attempts.
- Installed GDL 39R on co-pilot ELT bracket (hard to get bottom pop rivets in there)
Previously, installed AP Hub and GSA 28 pitch servo controller
Reinforced F-768 with J channel to support GSU 25 AHDARS...too low will interefere with slope in part - need to redo higher up
 |
F-745-L doubler reinforcement |
 |
F-745-L with GAD 29 installed |
 |
Full subpanel test assembled on bench |
 |
GDL-39R installed behind baggage |
 |
GDL-39R using Van's ELT bracket |
 |
GDL 39R mounted on bracket |
No comments:
Post a Comment